Page 3 - Section4.2.1-SWPPPCutSheet-FiltrexxStormWaterBlanket

This is a SEO version of Section4.2.1-SWPPPCutSheet-FiltrexxStormWaterBlanket. Click here to view full version

« Previous Page Table of Contents Next Page »

Post-Construction | Section 2: Storm Water Management | 363

SWPPP Cut Sheet -2.1. Filtrexx ® StormWater Blanket

Figure 1.1. Engineer Design Details for Storm Water Blanket.

Filtrexx ®

STORM WATER BLANKET

NTS

at the time of application.

10. Storm water blanket shall not be installed in areas of concen trated storm runoff fow, including channels and ditches. 11. Storm water blanket installed on slopes greater than 4:1 shall be tracked; installation on slopes greater than 2:1 shall be tracked and use other support practices, such as Filtrexx ® Lockdown Netting or Filtrexx ® Tackifying agent.

Page 3 - Section4.2.1-SWPPPCutSheet-FiltrexxStormWaterBlanket

This is a SEO version of Section4.2.1-SWPPPCutSheet-FiltrexxStormWaterBlanket. Click here to view full version

« Previous Page Table of Contents Next Page »